Prev | Next |
Assignment
A BPMN 1.1 Assignment element enables data to be copied between messages and new data to be inserted, using expressions within a BPEL Process. A BPMN 1.1 Assignment element maps to a BPEL 1.1 assign activity and copies the specified value from the source to the target.
In Enterprise Architect, Assignment elements should be created in the Assignments Package in SupportingElements. If they are created elsewhere, they cannot be enacted correctly.
Access
Ribbon |
Design > Diagram > Toolbox : > Specify 'BPMN 1.1 Types' in the 'Find Toolbox Item' dialog |
Keyboard Shortcuts |
: > Specify 'BPMN 1.1 Types' in the 'Find Toolbox Item' dialog |
Other |
You can display or hide the Diagram Toolbox by clicking on the or icons at the left-hand end of the Caption Bar at the top of the Diagram View. |
BPEL Properties:
Controls on BPEL Properties
Field/Button |
Action |
See also |
---|---|---|
Name |
Specify the name for the Assignment. |
|
Assign Time |
Select either Start or End to determine whether the assignment occurs at the start or end of an Activity / Event. |
|
Copy From Type |
Depending on the value selected in this field, further details are required. |
|
Copy From Literal |
Specify a literal value. |
|
Copy From Expression / Message |
Select a BPMN 1.1 Message in the Package representing the BPEL Process / Pool under the SupportingElements Package. |
Create BPEL 1.1 Model Structure Create a BPEL 1.1 Web Service |
Copy From Part |
Select a BPMN 1.1 Property belonging to the selected Message (Optional). |
|
Copy To Message |
Select a BPMN 1.1 Message in the Package representing the BPEL Process / Pool under the SupportingElements Package. |
Create BPEL 1.1 Model Structure Create a BPEL 1.1 Web Service |
Copy To Part |
Select a BPMN 1.1 Property belonging to the selected Message (Optional). |
|
OK |
Save the values entered in the dialog. |
|
Cancel |
Discard the values entered in the dialog. |
|
Help |
Display this Help topic. |
|
General |
Open the 'UML Properties' dialog. |
Properties |
Notes