Prev | Next |
Project Data Transfer
In normal system maintenance, it is likely that at some point you need to relocate data between storage systems. In any edition of Enterprise Architect, you might need to transfer all records from one project file to another (recommended after serious network crash or repeated database corruption). Project files can be either .eap (Access) files or .feap (Firebird) files, and you can transfer from one file type to the other.
In the Corporate, Unified and Ultimate editions of Enterprise Architect, you might need to:
- Transfer an existing project file to a DBMS repository such as SQL Server or MySQL
- Transfer a DBMS repository to an existing project file
- Move a repository from one DBMS to another (including moving between servers using the same DBMS)
- Copy all records from a JET 3.5 to JET 4 (Access 2000 or XP) repository - or back the other way
Access
Ribbon |
Configure > Model > Transfer > Project Transfer |
Perform a project data transfer
Step |
Action |
See also |
---|---|---|
1 |
Click on the radio button for the required transfer type:
|
|
2 |
In the 'Source Project' and 'Target Project' fields, type or select the name or connection string for the Source and Target projects. |
|
3 |
If you want to capture the transfer in a log file, select the 'Logfile' checkbox and browse for the appropriate log file location. |
|
4 |
Click on the . |
|
5 |
It is good practice to do a Project Compare after this process to verify that all records are written. |
Compare Projects |
Notes
Learn more